How quickly are we ready before the next ramp-up?
The start depends less on the software than on your master data: plants, cost centers, approval routes and the list of providers. Once those are in place, the first plant is productive within a few weeks; further ones follow the same pattern.
Can the shop floor supervisors still request people themselves?
Yes, and that is expressly intended. Requirements still arise where they arise, only with templates and approval stages per plant and cost center. The difference is not who is responsible, but visibility.
How does Pactos help distinguish a Statement of Work from leasing?
It documents, it does not decide. Contracted work runs with its own contacts, its own records and its own performance documentation; leasing runs with assignment data, deadlines and a reference to the hirer. The legal distinction remains a question of how the contract is drafted and how it is actually carried out.
What happens when an authorization or a screening expires?
Records sit with the person, with a validity date. Before expiry, the responsible role at the provider and at the client company gets a reminder. If something is missing, that is visible before the assignment, not first at the machine.
How do the hours from the shop floor get into the system?
Times are captured and approved digitally instead of travelling on paper. For operations with their own time management there are interfaces, among others to SAP, Infor, zvoove and TiMaS; the approved records are then the basis for invoice verification and billing.
We work with master vendors. Does Pactos fit that?
Yes. Master vendor, single vendor and mixed models can all be mapped, separately per plant if needed. Master and sub vendors have their own roles and permissions, so each party only sees what it is allowed to see, and you still keep the chain across every level.